Survey Team Timeline (8th months plan)

A short eight-month plan has been considered for the survey team (Aug 2019-Apr 2020). In the subsequent six months, the survey team intends to conduct three surveys for the following events: HSE Workshop, Future Energy, and 2nd Iran YP Awards. The survey of the HSE Workshop will be conducted in order to improve the quality of our events. The second survey relates to the Future Energy congress with the aim of mitigation of industrial challenges. The last survey tends to ameliorate the future Iran YP Awards congresses qualitatively. The provided timeline represents the summary of the considered plan, which is downloadable through below link.

Download